Quote Templates

Saved starting points for common bathroom and accessibility projects — line items, scope, exclusions, and payment schedule preloaded.

Standard Tub-to-Shower Conversion

Valid 30 days · 5 default line items

Tub-to-Shower Conversion
Default line itemsSample Pricing — Demonstration Only
Tub demolition and disposal × 1 job$1,450
Standard shower base × 1 each$1,980
Waterproof wall surround × 1 each$3,480
Plumbing fixture replacement × 1 each$820
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$8,650
Customer-facing scope summary

Remove existing tub, install acrylic shower base and waterproof surround, replace valve and trim, standard glass or curtain rod finish.

Suggested exclusions

Structural repairs, mold remediation, electrical work beyond fixture swap, painting outside the wet area.

Suggested payment schedule

10% deposit / 40% materials / 40% start of work / 10% final walkthrough

Internal checklist
Use in Quote Builder

Premium Walk-In Shower

Valid 30 days · 6 default line items

Walk-In Shower Installation
Default line itemsSample Pricing — Demonstration Only
Tub demolition and disposal × 1 job$1,450
Premium low-threshold shower base × 1 each$2,890
Tile shower surround × 1 each$5,800
Plumbing fixture replacement × 1 each$820
Project management × 1 week$900
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$12,780
Customer-facing scope summary

Low-threshold composite base with full tile surround, upgraded fixtures, frameless glass allowance.

Suggested exclusions

Glass upgrades beyond allowance, plumbing relocation, flooring outside shower footprint.

Suggested payment schedule

10% deposit / 40% materials / 40% start of work / 10% final walkthrough

Internal checklist
Use in Quote Builder

Accessibility Safety Upgrade

Valid 45 days · 6 default line items

Accessibility Upgrade Package
Default line itemsSample Pricing — Demonstration Only
Accessibility consultation × 1 each$250
Standard grab bar installation × 2 each$370
Reinforced grab bar installation × 2 each$480
Non-slip vinyl flooring × 60 sq ft$840
Comfort-height toilet, installed × 1 each$940
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$3,800
Customer-facing scope summary

In-home assessment, grab bars at shower and toilet, non-slip flooring, comfort-height toilet.

Suggested exclusions

Doorway widening, ramp construction, electrical modifications.

Suggested payment schedule

25% deposit / 50% start of work / 25% completion

Internal checklist
Use in Quote Builder

Roll-In Shower Conversion

Valid 30 days · 8 default line items

Roll-In Shower / Wheelchair Accessible Upgrade
Default line itemsSample Pricing — Demonstration Only
Tub demolition and disposal × 1 job$1,450
Roll-in shower pan with linear drain × 1 each$4,300
Waterproof wall surround × 1 each$3,480
Fold-down shower seat × 1 each$620
Reinforced grab bar installation × 2 each$480
Rough plumbing relocation × 1 job$5,400
Permit allowance × 1 allowance$850
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$17,500
Customer-facing scope summary

Zero-threshold roll-in shower with linear drain, reinforced bars, fold-down seat, handheld shower.

Suggested exclusions

Bathroom expansion, door widening beyond existing frame.

Suggested payment schedule

10% deposit / 40% materials / 40% start of work / 10% final walkthrough

Internal checklist
Use in Quote Builder

Full Bathroom Remodel

Valid 30 days · 8 default line items

Full Bathroom Remodel
Default line itemsSample Pricing — Demonstration Only
Full bathroom demo and disposal × 1 job$3,200
Rough plumbing relocation × 1 job$5,400
Tile shower surround × 1 each$5,800
Standard vanity replacement × 1 each$2,600
Comfort-height toilet, installed × 1 each$940
Permit allowance × 1 allowance$850
Project management × 1 week$900
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$20,610
Customer-facing scope summary

Full gut remodel: new shower or tub, tile, vanity, toilet, lighting and ventilation per plan.

Suggested exclusions

Window replacement, structural changes, fixtures beyond selected allowances.

Suggested payment schedule

10% deposit / 40% materials / 40% start of work / 10% final walkthrough

Internal checklist
Use in Quote Builder

Grab Bar and Safety Package

Valid 45 days · 3 default line items

Grab Bar Installation
Default line itemsSample Pricing — Demonstration Only
Standard grab bar installation × 2 each$370
Reinforced grab bar installation × 2 each$480
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$1,770
Customer-facing scope summary

Grab bars at shower, tub, and toilet locations with proper blocking or anchors.

Suggested exclusions

Wall repairs beyond mounting points.

Suggested payment schedule

Due on completion

Internal checklist
Use in Quote Builder

Flooring and Accessibility Package

Valid 30 days · 4 default line items

Flooring and Safety Upgrade
Default line itemsSample Pricing — Demonstration Only
Non-slip vinyl flooring × 60 sq ft$840
Standard grab bar installation × 2 each$370
Comfort-height toilet, installed × 1 each$940
Labor per hour × 8 hr$920
Starting point (before conditions and approval)$3,070
Customer-facing scope summary

Non-slip flooring replacement with threshold transitions, optional grab bars and comfort-height toilet.

Suggested exclusions

Subfloor replacement beyond minor patching.

Suggested payment schedule

25% deposit / 50% start of work / 25% completion

Internal checklist
Use in Quote Builder
All estimates require business approval before being sent to the customer. Final pricing may vary based on site conditions, materials, permits, labor availability, local requirements, and project scope.