Quote Templates
Saved starting points for common bathroom and accessibility projects — line items, scope, exclusions, and payment schedule preloaded.
Standard Tub-to-Shower Conversion
Valid 30 days · 5 default line items
Remove existing tub, install acrylic shower base and waterproof surround, replace valve and trim, standard glass or curtain rod finish.
Structural repairs, mold remediation, electrical work beyond fixture swap, painting outside the wet area.
10% deposit / 40% materials / 40% start of work / 10% final walkthrough
Premium Walk-In Shower
Valid 30 days · 6 default line items
Low-threshold composite base with full tile surround, upgraded fixtures, frameless glass allowance.
Glass upgrades beyond allowance, plumbing relocation, flooring outside shower footprint.
10% deposit / 40% materials / 40% start of work / 10% final walkthrough
Accessibility Safety Upgrade
Valid 45 days · 6 default line items
In-home assessment, grab bars at shower and toilet, non-slip flooring, comfort-height toilet.
Doorway widening, ramp construction, electrical modifications.
25% deposit / 50% start of work / 25% completion
Roll-In Shower Conversion
Valid 30 days · 8 default line items
Zero-threshold roll-in shower with linear drain, reinforced bars, fold-down seat, handheld shower.
Bathroom expansion, door widening beyond existing frame.
10% deposit / 40% materials / 40% start of work / 10% final walkthrough
Full Bathroom Remodel
Valid 30 days · 8 default line items
Full gut remodel: new shower or tub, tile, vanity, toilet, lighting and ventilation per plan.
Window replacement, structural changes, fixtures beyond selected allowances.
10% deposit / 40% materials / 40% start of work / 10% final walkthrough
Grab Bar and Safety Package
Valid 45 days · 3 default line items
Grab bars at shower, tub, and toilet locations with proper blocking or anchors.
Wall repairs beyond mounting points.
Due on completion
Flooring and Accessibility Package
Valid 30 days · 4 default line items
Non-slip flooring replacement with threshold transitions, optional grab bars and comfort-height toilet.
Subfloor replacement beyond minor patching.
25% deposit / 50% start of work / 25% completion